Designed to meet the needs of high-volume distribution and supply chain operations, the hub offers a seamless blend of scalability, efficiency, and advanced infrastructure. Developed and constructed by Contek, the project showcases the company’s dedication to operational excellence, durability, and smart industrial development.
Total Construction Budget:
This includes core structure, façade systems, interior fit-outs, mechanical and electrical systems, and sustainability certifications (LEED Gold).
€16/m² per month, depending on floor level, unit size, and fit-out options.
Executive floor lease: From €20/m² per month (15th floor with premium finishes and skyline view)
Common Area Maintenance (CAM): €3.50/m²
Fit-out and customization packages available upon request.
LEED Gold Pre-Certification
Designed to meet LEED Gold standards, ensuring up to 30% lower energy usage and 35% improved air quality compared to standard office buildings.
High-Performance Glass Façade
Energy-efficient façade with 65% solar heat reduction and 40 dB sound insulation, ensuring comfort and reduced operational costs.
Dual power supply and fiber optic connectivity
Ensure 99.9% uptime and data transfer speeds up to 10 Gbps.
Triple-Speed Elevators
Equipped with 6 high-speed elevators operating at 3.5 m/s, reducing average wait time to under 30 seconds even during peak hours.
Designed to meet the needs of high-volume distribution and supply chain operations, the hub offers a seamless blend of scalability, efficiency, and advanced infrastructure. Developed and constructed by Contek, the project showcases the company’s dedication to operational excellence, durability, and smart industrial development.